Project to Design & Execute Cairo- Ur Bridge in Baghdad |
|
|
Project cost: The project cost is about 28 million dollar .
Project description: The project was referred from Baghdad Municipality in the year 2005, it is considered as one of the first bridges recently executed & designed to facilitate traffic until the year 2025, without any need for additional development. The surface area is about 30 000 M2 whereas the bridge’s total width is from 18-24 M for both directions.
It is one of the beautiful bridges by using the Box Girder construction system with 15 girders having length between 13.5—31 M.
The company made a contract with the German Pen Co., to supply molds & scaffolds related to bridge execution, these are used in Iraq for the first time. Pen Co. is pioneer in the world with regard to molds. An area about 30 000 M3 which were executed with regard to ready concrete for the bridge works. A contract was made with the German Liebherr Co., in order to install concrete baching plant with capacity of 120 M3 /h.,& supply the site with “2” concrete pumps.
|
|
|
|
|
Al -Talbiya Bridge Construction |
|
|
|
|
watch video |
|
|